Skip to content

Solutions

The work that scales linearly with headcount.

The Operations & HR shelf: scheduling, time, the warehouse or job-site paper pile. Same catalog category as People — different owner of the week.

Filter11 products

PlanGrowth

01 — Problem / 3 costs

The coordination work that grows with every hire.

Operations absorbs what no other system owns. Each new site, crew, or shift adds a hand-off that lives in somebody's head until it becomes a hire.

  • Scheduling, time, and the document pile grow with every hire. Headcount was the workaround for a tool that never made it into the SOP.
  • The warehouse or job-site document still gets re-typed into the system of record by a person on the other end.
  • The pilot that demoed well never named an owner, an exception path, or a revoke switch, so it stayed impressive and never shipped.

02 — Shelf / 6 of 11 products

A filtered shelf for Operations.

Query-backed from the catalog — not a hand-picked list. Hours on each card are catalog math at a stated volume, not a customer result.

See products for Operations

03 — Week one

What changes in week one for Operations.

Not a roadmap and not a rollout plan — the first week as it actually runs, with the part that stays yours named.

Week one you pick the single document or hand-off that gets re-keyed most often and put it through the product that names it. Output lands in the system of record your team already opens, with an owner and a revoke switch written down before the first run. The floor exception, the union rule, and the one-off that is not in the SOP stay with you.

04 — Integrations / 12 connectors

Typical connectors on this shelf.

Taken from the products that actually match the filter. An integration with no product behind it is not coverage.

Connector marks are not a logo wall. QuickBooks is not a customer.

05 — Effort

What it takes, and what it will not do.

Setup minutes are a published number. Prerequisites are the connectors on the card plus a named approver wherever money moves.

Setup minutes are a promise on the card. You still own the floor exception, the union rule, and the one-off that is not in the SOP.

Products in this filter
11
Median published setup
45 minutes — catalog figure, not a customer study.
Slowest published setup
120 minutes on this set. Packs take longer. We do not round that down to “under an hour.”
OAuth required
7 of 11 are connected — you authorise the system on the card; you do not map fields.
Self-hosted on this set
1. Those run on your keys and consume no credits.
Recommended plan
Growth. Growth is the core self-serve plan. If the site, the warehouse, or the roster is the differentiator, that is Enterprise custom work — not this shelf.

Start

Fourteen days of Growth. No card. 25,000 credits.

If you already know the SKU, open the shelf. Demo is for Scale, Enterprise, and anyone whose MSA requires a human on the call.

No card required for the trial.